Site Profile(as of March 31, 2011)
| Site Area |
| North Area |
676,200 |
m² |
| South Area |
492,500 |
m² |
| Capacity of Major Equipment |
| No.1 Topping Unit |
100,000 |
barrels / day |
| New Vacuum Distillation Unit |
20,000 |
barrels / day |
| No.2 Topping Unit |
120,000 |
barrels / day |
| No.2 Vacuum Distillation Unit |
60,000 |
barrels / day |
| Prefractionator Unit |
23,000 |
barrels / day |
| No.1 Catalytic Reforming Unit |
11,500 |
barrels / day |
| No.1 Reformate Splitter |
9,000 |
barrels / day |
| No.2 Catalytic Reforming Unit |
25,000 |
barrels / day |
| No.2 Reformate Splitter |
20,000 |
barrels / day |
| Fluid Catalytic Cracking Unit |
40,000 |
barrels / day |
| FCCGasoline Hydrodesulfurization Unit |
24,000 |
barrels / day |
| No.1 Hydrodesulfurization Unit |
8,000 |
barrels / day |
| Isomerization Unit |
6,000 |
barrels / day |
| No.2 Hydrodesulfurization |
26,000 |
barrels / day |
| No.3 Hydrodesulfurization |
55,000 |
barrels / day |
| No.4 Hydrodesulfurization Unit |
50,000 |
barrels / day |
| Vacuum Gas Oil Hydrodesulfurization Unit |
35,000 |
barrels / day |
| Hydrogen Recovery by Membranes Separation System Unit |
2units 643,200 |
m3N / day |
| No.10 Fuel Oil Hydrodesulfurization Unit |
36,000 |
barrels / day |
| No.20 Fuel Oil Hydrodesulfurization Unit |
36,000 |
barrels / day |
| No.1 Hydrogen Producing Unit |
648,000 |
m3N / day |
| No.10·20 Hydrogen Producing Unit |
880,000 |
m3N / day×2 |
Sulfur Recovery Unit (With Tail Gas Treating Unit) |
150 |
t / day×3 |
| Blown Asphalt Unit |
3,600 |
t / month |
| Power Facilities |
| Boilers |
3units |
323t / hour |
| Steam Turbine Generator |
4units |
26,600kW |
| Co-generation Unit |
|
39,500kW |
| Oil Storage Facilities |
| Crude Oil Tanks |
13units |
930,500kl |
Finished Product / Semi-processed Product Tanks |
109units |
1,300,300kl |
| Lubricating Oil Tanks |
66units |
23,800kl |
| Sulfur Tanks |
2units |
13,200kl |
| Asphalt Tanks |
20units |
28,000kl |
| LPGTanks |
25units |
55,100kl |
| Port Facilities |
| Crude Oil Tanker Berth |
1unit |
100,000DWT |
| Keiyo Sea Berth |
1unit |
314,250DWT |
| Loading/Unloading Piersc |
26units |
|